Suggested Document Tracking Items

The list below is a sample list of items that may be useful for Project Administrators to set up in Document Tracking Item Maintenance.

Code

Description

Type

Message

100

Signed Subcontract Agreement

Y/N

Subcontract has not been signed

110

20 Day Preliminary Notice Sent

Y/N

20 Day notice has not been sent

120

Payment & Performance Bond

Y/N

Payment & Performance Bond Received

130

Personal Identifiable Information

Y/N

Personal Identifiable Information completed by sub

140

QA/QC Plan

Y/N

QA/QC Plan Required

200

WC insurance

Date

WC insurance has expired

220

General Liability Insurance

Date

Gen Liability insurance has expired

230

Automobile Insurance (if separate)

Date

Automobile Insurance has expired

300

Certified Payroll Required

Check

Certified Payroll is Required

310

Letter Designating Payroll Clerk

Y/N

Letter Designating Payroll Clerk has not been Received.

320

Lower Tier Subcontract

Y/N

Subcontractor has lower tier subcontractors

330

EEO Policy Number

Y/N

EEO Policy has not been Received

500

Safety Program

Y/N

Safety Program is required

510

Safety Checklist

Y/N

Safety Checklist submitted

700

Material Certifications Required

Y/N

Material Certifications Required

710

Hazardous Material Tracking

Y/N

Hazardous Material Tracking Required

800

W9 Received

Y/N

W9 Not Received

810

SF 1413

Y/N

Form 1413 has not been received

900

Lien Release

Check

Print Lien Release when printing checks