Draw Request by Percent Markup - Cost Center Information

If the cost center feature is enabled in the Enterprise Installation screen, when performing Draw Request Cost Selection Spectrum will calculate the draw only if the operator has permission to access the job’s information. As the operator requests each job, Spectrum compares the cost center assigned to the job with cost centers in the operator’s assigned scheme; if the cost center is not included, then access to draw requests for that job will not be allowed.

When the operator’s scheme includes override settings for ‘Job’ entries in Cost Center Scheme Maintenance, this screen will validate the cost center assigned to the job based on these overrides. The override cost center(s) supersede the cost center list defined for the scheme in general. Spectrum will compare the cost center assigned to the job with ‘Job’ override cost centers in the operator’s assigned scheme; if the cost center is not included, then access to draw requests for that job will not be allowed.

Spectrum also compares the contract’s cost center with cost centers in the operator’s assigned scheme; if the cost center assigned to the contract is not present, then access to draw requests for that contract will not be allowed.

When the operator’s scheme includes override settings for Contract’ entries in Cost Center Scheme Maintenance, this screen will validate the cost center assigned to the contract based in these overrides. The override cost center(s) supersede the cost center list defined for the scheme in general. Spectrum will compare the cost center assigned to the cont with ‘Contract’ override cost centers in the operator’s assigned scheme; if the cost center is not included, then access to draw requests for that contract will not be allowed.

All detail lines are displayed when the operator has authorization to access the draw request, but changes are not permitted to billing item lines that the operator is not authorized to access.