Example: Setting Up Bill Groups
In the example provided, Mob/Demob, Repave Three Miles of Road, and Landscaping are the three bill groups.
SpectrumÂ
list_alt
In the example provided, Mob/Demob, Repave Three Miles of Road, and Landscaping are the three bill groups.
Bill group 1: MOB/DEMOB | ||
$7,000.00 | Item #1A | Mobilization |
$3,000.00 | Item #1B | Demobilization |
Bill group 2: REPAVE THREE MILES OF ROAD | ||
3 miles | Item #2A | Grind Asphalt |
3 miles | Item #2B | Gravel |
3 miles | Item #2C | Compact/Roll |
3 miles | Item #2D | Pave |
75 each | Item #3D | Trees/Shrubs |
Bill group 3: LANDSCAPING | ||
3 miles | Item #3A | Bank Protection |
2 miles | Item #3B | Hydroseeding |
3 miles | Item #3C | Ditch Cleaning |
3 miles | Item #2E | Paint Striping |