Change Order Form - Cost Center Information

If the cost center feature is enabled in the Enterprise Installation screen, Spectrum will verify that the operator requesting the report has permission to access the contract. Spectrum compares the contract’s assigned cost center with cost centers in the operator’s assigned scheme; if the cost center is not present, then quantity transactions for that contract will not be included.

When the operator’s scheme includes override settings for ‘Contract’ entries in Cost Center Scheme Maintenance, this report will validate the cost center assigned to the contract based on these overrides. The override cost center(s) supersede the cost center list defined for the scheme in general. Spectrum will compare the cost center assigned to the contract with ‘Contract’ override cost centers in the operator’s assigned scheme; if the cost center is not included, then that contract will not be shown on the report.