Multiple Join screen

Use the Multiple Join screen to automatically join vectors or lines from an imported drawing based on distance and direction.

You specify the maximum distance between the items to join.

If joining vectors and more than one vector is selected, only the selected vectors will be joined. If only one vector is selected, or if no vectors are selected, vectors from all selected Vector Layers will be joined.

Note: There may be cases in which Viewpoint Estimating does not join multiple items as expected. For example, Viewpoint Estimating may not be able to join lines if the end segments are not close to parallel, even if they are within the join distance. Alternatively, Viewpoint Estimating may join vector segments that should not be joined, based on their curvature and location.

To open a job in the Manage Earthwork Estimates screen, click Estimating > Earthwork > Manage Earthwork Estimates in the All Tasks pane. Click Open Existing Job. Then select the job you want to open, and click OK.