Bulk Edit Drawings

You can edit multiple drawings to modify the revision number, issued date, received date, discipline, and area of the drawings by going to Projects > Drawings > Edit.

  1. From the home page, under Projects, select the name of the project you want to open.
    Alternatively, go to the main menu in the upper left-hand corner, select Projects, and then select the name of the project you want to open.
    The Dashboard for the project appears.
  2. Select the Drawings tab.
  3. Select the check box for each drawing you want to edit.
  4. Click the Edit button .
    The Bulk Edit Drawing dialog appears.
  5. Select the check box and edit the drawing fields as needed.
    FieldDefinition
    Revision Revision number for the drawing.
    Issued Date The date the drawing was issued.
    Received Date The date the drawing was received.
    Discipline Project discipline (example: Architectural) for the drawing.
    Area Project area for the drawing.
    Note: If Project Areas has been enabled for your project, note that drawings are assigned to the "Unassigned" area by default. To see the list of available areas, delete the "Unassigned" text in the Area field.
  6. Click Save to save the edits.