SL Item
Entry in this field is not required. However, if entry is made, it must be valid.
Enter the subcontract item to which this invoice item applies. The item’s assigned job, phase, and cost type (as set up in SL) and the job/phase/cost type’s U/M (as set up in JC) are displayed. These fields cannot be changed.