Use Different Labor Cutoff Date
The Use Different Labor Cutoff Date check box on the JB Bill Initialization form.
This checkbox is enabled for Initialize Option T (T&M only) or B (Progress and T&M), but applies to T&M items only. However, if the Ticketed Cost Option drop-down is set to O-Ticketed Costs Only, these fields are disabled.
Check this box to use a different cutoff date (than the Cost Detail Cutoff Date) for pulling in labor-type job cost detail. Use the Labor Cutoff Date field to specify the date through which to pull labor-type cost detail.
Leave this box unchecked if labor-type job cost detail is pulled based on the Cost Detail Cutoff Date.