Labor Cutoff Date

The Labor Cutoff Date field on the JB T&M JC Detail Fill Grid form.

This field is enabled once you select the Use Different Labor Cutoff Date check box.

Enter the date through which to pull labor costs from Job Cost. If left blank, the system will populate the grid with all available labor-type costs.

Note: The system will only pull labor costs that do not already exist on the billing for the specified bill line sequence.