Budget Code

Enter the budget code (from JC Budget Codes) that applies to this projection detail line. Once entered, this detail line will default values defined for the budget code in JC Budget Codes (e.g. Description, Budget UM and, depending on budget code’s basis, Hrs/Unit, Cost/Hour, and/or Unit Cost/Rate).

Note: Defaults (other than description) only apply if the budget code’s Costing Level is ‘Detail’. Why is this field disabled?

The Projection Detail tab is only enabled when the Activate projection detail feature box is checked (PM Company Parameters form, Projections tab).

The fields on the Projection Detail tab are enabled based on the JB cost type category associated with the selected cost type (JC Cost Types form, JC Cost Type Category field).

JC Cost Projections