Budget UM
Display only, the unit of measure specified for the budget code in JC Budget Codes, depending on the basis. If the basis is ‘Hour’, this will be the Time UM; if basis is ‘Unit’, this will be the Work UM.
If you did not specify a budget code, this field displays as null.