Budget UM

Display only, the unit of measure specified for the budget code in JC Budget Codes, depending on the basis. If the basis is ‘Hour’, this will be the Time UM; if basis is ‘Unit’, this will be the Work UM.

Note: If the budget code Costing Level is ‘Subtotal’ or ‘Total’, this field defaults as null, since no unit of measure is specified for these costing levels.

If you did not specify a budget code, this field displays as null.

 