Final
Use this field to override (plug) projected final amounts.
If using the ManDays option (last line), the value entered here will be multiplied by the Hrs/ManDay (shown above the entry grid) to determine the final hours. For example, if Hrs/ManDay is set to ‘8’, and you change the final man-days from ‘100’ to ‘130’, the remaining hours will be increased to 1040 (130 x 8). All other man-day and hours values (i.e. over/under and remaining) are recalculated accordingly.
Once you plug a value, all other values on that line (as well as all lines below it) will be recalculated by the system. When you update the line, an asterisk is placed in the P column (upper grid) to indicate plugged amounts, and the line color changes to light yellow. If the Buy Out flag is checked for the phase and the plugged value does not equal the buy out value, the line color changes to blue. If a line’s remaining committed cost plus actual cost exceeds the projected cost, the line color changes to peach (only if using Actual projection method). (Tip: Right clicking the mouse will display an explanation of what the row colors represent.)