Job

Enter the job that you want to calculate projections on or press F4 to select it from a list.

Once a job is selected, the grid will display the phases and cost types on the selected job based on the options set up using the JC Projection Options form. You can open this form by selecting File > Projection Options from the top of the form.

You can only select a soft- or hard-closed job if the Allow Posting to Soft-Closed Jobs/ Allow Posting to Hard-Closed Jobs boxes on the Info tab of JC Company Parameters are checked.

Note: Although not recommended, the system will allow the same job to be opened in multiple projection batches in the same month without affecting another user’s work - for example if you have large jobs where project managers need to do projections within their area of work at the same time. If you wish to use this feature, you need to check the Allow Jobs to be in Multiple Open Batches in the Same Month box on the Projections tab of JC Company Parameters . However, when using this feature, be aware that if more than one user posts to the same phase/cost type, the last batch posted will determine the final values for the phase/cost type.

JC Cost Projections

Projection Options