Over/Under
Disabled for U/C and U/HR, HR/U, ManDays, and CST/HR.
Use this column to override (plug) the amount your project will be over or under the current estimate amount. Enter amounts that are under the current estimate as a negative value (e.g. -2,500.00).
Once you plug a value, all other values on that line (as well as all lines below it) will be recalculated by the system. In addition, an asterisk is placed in the P column (upper grid) to indicate plugged amounts, and the line color changes to light yellow. If the Buy Out flag is checked for the phase and the plugged value does not equal the buy out value, the line color changes to blue. If a line’s remaining committed cost plus actual cost exceeds the projected cost, the line color changes to peach (only if using Actual projection method).