Unit Cost
Enter the unit cost for this projection detail line. Initially defaults as follows:
If you specified an hour-based budget code and:
Labor or equipment cost type, defaults based on cost/hour x Number Of field
Burden cost type, defaults from the cost/hour
Material, Subcontract, or Other cost type, defaults as null
If you specified a unit-based budget code and:
Labor or equipment cost type, and you specified a cost/hour, defaults based on cost/hour x Number Of field. If you do not specify a cost/hour, defaults as null
Burden cost type, defaults from the cost/hour
Material, Subcontract, or Other cost type, and the Budget UM is equal to cost type UM, defaults the unit cost specified for the budget code in JC Budget Codes. If Budget UM is not equal to cost type UM, defaults as null
Why is this field disabled?
The Projection Detail tab is only enabled when the Activate projection detail feature box is checked (PM Company Parameters form, Projections tab).
The fields on the Projection Detail tab are enabled based on the JB cost type category associated with the selected cost type (JC Cost Types form, JC Cost Type Category field).