Add Allocation Phase Even if Job is Locked

Specify how to handle allocation phases and cost types not already set up for ‘apply to’ jobs with locked phases.

Check this box to override a job’s ‘locked phases’ status and add the allocation phase and cost type to JCJP (JC Job Phases) and JCCH (JC Cost Header).

Leave this box unchecked if you do not want to add the allocation phase and cost type to jobs with locked phases. Batch entries will still be added to the JC Cost Adjustment batch, but batch validation will create an error message for any batch sequence where the phase/cost type does not exist (in Job Phases) for a job with locked phases.

 

JC Process Cost Allocations