Order By

Select the sort order of the projections grid.

  • Contract Item – Select this option to sort grid records by contract item. Grid will display all phases/cost types assigned to the contract item specified in the Item field in lower section of the form.

  • Phase– Select this option to sort grid records by phase. Grid will display all phases/cost types in numeric order based on the phase range selected in the Phase Options below.

     

JC Projection Options

JC Cost Projections 6.7