Ins Code
For existing job phases, this field is disabled and displays the insurance code assigned to the phase in JC Job Phases or blank, if no insurance code assigned in JC Job Phases.
For new phases, enter the insurance code (from HQ Insurance Codes) that applies to this phase, if applicable. Once record is saved, phase and insurance code will be updated to JC Job Phases (applies to ‘locked phases’ jobs as well).