Total Percent

Defaults a value based on Current Estimated and Total Completed.

Enter the new total percent complete (enter 15% as 15.00) or accept the system calculation. If overriding the calculated amount, the New Completed and Total Completed units will be recalculated.

Percent complete generally represents the percentage of estimated units that have been done. However, if you have plugged a different projected units figure in the Cost Projections program, that figure is used instead, and is identified by an asterisk (*) next to the projected number.

JC Progress Entry