U/M

Initially displays the unit of measure assigned to the cost type (in either JC Phases or in JC Job Phases). You may override/change this unit of measure as long as:

  • the UM exists in HQUM (HQ Units of Measure).

  • no change order detail exists in JCOD (Change Order Detail) where the source status equals ‘J’ (Job Cost) or ‘I’ (Interfaced).

  • no change order detail exists in PMOL (Change Order Lines) where the source status equals ‘J’ (Job Cost) or ‘I’ (Interfaced).

  • the TotalCmtdCost and RemainCmtdCost = 0.00 for every month in JCCP (Cost by Period).

If this criteria is met, the change is allowed and will update JCCD (Cost Detail) as follows:

  • If the JCCD UM is not equal to the JCCH UM, sets the estimated units to 0.00.

  • Updates projections (PF) records, setting the projected and forecast units to 0.00 where the JCCD UM is not equal to the JCCH UM.

  • Updates posted units equal to actual units and the posted UM to the JCCH UM where the posted UM is null and the JCTransType is not ‘PF’ or ‘OE’.

  • Updates actual units to 0.00 and the JCCD UM to the JCCH UM for all transactions where the JCCD UM is not equal to the JCCH UM and the JCTransType is not 'PF' or 'OE'.

  • Updates the actual units equal to the posted units where the posted UM is equal to the JCCH UM and the JCTransType is not ‘PF’ or ‘OE’.

 

 

JC Original Estimates