PR Leave Level

PR Leave Level field in the JC Jobs form, PR Info tab.

When you process PR Auto Leave, the system compares the following two rates and uses the highest of the two in leave accrual calculations:
  • the rate set for the employee in the PR Employee Leave form, or if there is not one there, the PR Leave Codes form
  • the rate associated with the leave level code (as set in the PR Leave Codes form, Leave Level Overrides tab)
If the job leave rate happens to be the highest of the two, the amount of leave accrued by the employee is also based on how much they worked on the job.
Note: Job-specific Leave Level overrides affect only accruals . These accruals cannot override limits, nor do they impact frequencies or usage.

Note: Many of the fields on the JC Jobs form are also on the PM Projects form. When you make a change to this field on the JC Jobs form, the system immediately updates the same field on the PM Projects form.