Allocation Rate
Enabled only if allocating based on a rate.
Enter the rate (percentage) for this allocation or enter 0.00 to enter the amount at the time you process this allocation (in JC Process Cost Allocations). If the allocation basis is Hours, this rate represents the dollar amount per hour.
Leave this field blank if you want the allocation rate to be specified on a per job basis using the Job Rate Column below.