Post To: Cost Type

Required if the allocation basis is Revenue.

Enter the cost type to which allocated costs will be posted on each job. If this field is left blank (Costs or Hours basis only), allocated amounts will be posted to each of the basis cost types (defined in Cost Types to Include section).

Note: When posting allocations, if the cost type specified here does not exist for the job/phase, it will be added automatically unless the job is ‘locked’. To add the cost type to locked jobs, you will need to check the Add Allocation Phase Even if Job is Locked box in JC Process Cost Allocations.

JC Allocation Codes