Rate

This field is enabled only when Costing Level is ‘Detail’ and Basis is ‘Hour’.

Enter the rate for the specified time unit of measure.

This rate will default as the Cost/Hour when this budget code is specified for a projection detail sequence in JC Cost Projections (Projection Detail tab) or assigned to a budget in PM Project Budgets (Budget Detail tab).

 

 

JC Budget Codes