Unit Cost

This field is enabled only when Costing Level is ‘Detail’ and Basis is ‘Unit’.

Enter the unit cost for the specified work unit of measure.

This unit cost will default as the Unit Cost when this budget code is specified for a projection detail sequence in JC Cost Projections (Projection Detail tab) or assigned to a budget in PM Project Budgets (Budget Detail tab).

 

 

JC Budget Codes