Cost Type

If you want the liability costs to be redirected to a specific cost type, enter that cost type here. Otherwise, leave blank to have the liability costs go to the same cost type as the earnings. You can use any valid cost type (from JC Cost Types), even if the cost type is not used on any of the phases set up for the associated job and the phases are not locked in PM Projects and JC Jobs.

 

JC Liability Template