Cost Amount

Enter the projected cost amount for this period (month).

If you checked the Allow Forecasting box (Forecast Info tab) and forecasting options have been defined in JC Company Parameters (Forecast tab), this field will default an amount based on the cost estimate (Forecast Info tab) x cost percent specified for this month (to the left). Overriding the default amount will recalculate the cost percent.

PC Potential Projects