Total Cost
The system automatically defaults the total cost as a sum of all other costs (labor, material, equipment, subcontract, and other). You can override the calculated value if desired; however, cost breakdown amounts will not be recalculated (since the system has no way of knowing which cost to update).
If you did not breakdown costs for this project, the total cost defaults as null. Enter the total cost for this project.