CT

Enter the JC cost type the job purchase order applies to or press F4 to select one from a list.

This field initially defaults the material cost type assigned to this line's specified material (in HQ Materials). If no material cost type specified for the material, defaults as null. May be overridden.

Note: If the Phases on this job are locked box is checked in JC Jobs, the cost type specified here must be set up for the specified phase in JC Job Phases. If the Phases on this job are locked box is not checked, you must specify a valid cost type for the phase in JC Phases.

PO Purchase Order Entry