Phase

Specify the phase to which this job purchase order item applies. Initially defaults the material phase assigned to this line's specified material (in HQ Materials). If no material phase specified for the material, defaults as null. May be overridden.

Note: If the 'Lock Phase' option in JC Jobs is in use, this phase must be set up for this job in JC Job Phases. If the 'Lock Phases' option is not in use, must be a valid phase from JC Phases.

PO Purchase Order Entry