CT

For Job requisition lines only.

Specify the cost type (from JC Cost Types) to which the material is being charged. Must be a valid cost type for this phase or job phase. Initially defaults the material cost type from HQ Materials (if specified for the material).

PO Requisition Entry

Creating Requisitions - Overview