Total Cost

If the unit of measure is LS (lump sum), specify the total cost for this material (or enter 0.00 if not known).

If unit of measure is not lump sum, defaults an amount based on the units x unit cost / ECM. If overridden, the unit cost will be recalculated.

PO Requisition Entry

Creating Requisitions - Overview