Phase

Specify the phase that committed costs for this item will be posted to in Job Cost. The phase’s description displays below this field.

If this is an add-on item, this field initially defaults the phase assigned to the add-on in SL Add-ons; may be overridden.

Note: If the Lock Phases option (JC Jobs) is in use for this job, the default phase must be set up for the job in JC Job Phases before it will be accepted here.