Phase

This field is only enabled for job timesheets (i.e. the Type is J-Job).

Enter the phase on which the employee was working. Press F4 for a list of valid phases for the job.

SM Work Order Timesheets

For job-related work orders only, this field displays the phase to which labor costs will be posted. Defaults from the work order scope and cannot be changed.

Note: If the work order scope has not been assigned a phase, the phase will default as blank and you will be unable to save the record. Since this field is disabled for SM work order timesheets, you cannot assign a phase here; however, you can assign a phase to the work order scope by pressing F5 from the SM Wo or SM Scope fields. Once you assign a phase to the scope, you will be able to save the timesheet.