Reopen a Material Order

A material order can be reopened after it has been closed by pulling it into an open material order entry batch, changing the Status to "Open", and posting the batch.

Note: If any remaining units or costs existed when the material order was closed, they are not restored, nor are allocated units updated in the IN Location Materials form.