Field Definitions: PM Submittal Initialization-65 Form
The following is a list of field descriptions for the PM Submittal Initialization-65 form.Many of the descriptions include links to other topics that provide additional information about or related to the topic.
Project
Specify the project for which to initialize submittals. Must be a valid project set up in PM Projects.
Starting Submittal Number
Specify the number with which to begin numbering submittals.
Submittal Type
Specify the type of submittal to initialize. Must be a document type (defined in PM Document Types) with a document category of ‘Submittal’.
Initialize Submittals
- Initialize Submittal for Each Unique Phase — Select this option if you want to initialize a submittal for each unique phase (within the range of phases specified) on the project.
- Initialize Submittal for Each Phase Using Valid Part of Phase Code — Select this option if you want to initialize a submittal for each phase (within the range of phases specified) based on the Number Of Valid Characters In Phase Code defined in JC Company Parameters. In other words, a submittal will be generated for each phase code for which the valid part of phase differs. For example, if the valid part of phase code is 5:
03110-100-001 > Submittal #1
03110-100-002 Submittal #1
03112-100-001 Submittal #2
Beginning/Ending Phase
Indicate the phase with which to begin and end the submittal initialization.
Required Receipt Date
Specify the date that these submittals are required back from the subcontractor.
Required Activity Date
Specify the date by which all activities indicated on initialized submittals are scheduled to begin.