Due

Specify the due date type for this work order quote sequence.

  • 0-By — Select this option if the work associated with this quote sequence is due by a specific date. When selected, the second date field (right) is enabled; use this field to enter the "due by" date.

  • 1-Within — Select this option if if the work associated with this quote sequence is due within a specified time-frame. When selected, both date fields (right) are enabled. Use these fields to enter the beginning and ending date in the "due within" date range.

When you approve the quote, the system will generate a work order and update this due date type to the related work order scope sequence.