Labor: Cost Rate

Enter the cost rate for this labor requirement. Initially defaults a rate from SM Labor Cost Estimate based on the current date and the information entered for the labor requirement (e.g. PRCo, Technician, Craft, Class, and/or Effective Date). If no matching record is found in SM Labor Cost Estimate, the cost rate defaults as 0.00. For more information, see Setting Up Labor Cost Rate Estimates.