Material: Cost Total

This field defaults the total cost for this requirements line. You may override the defaulted value. If you override the defaulted value, the system will automatically recalculate the Cost Rate.

Note: For material requirements entered on a work order quote, if you check the Derived Estimate box for the quote sequence (Info tab), the system will generate a Cost Total for the quote sequence based on the cost total of all required resource lines defined for the quote sequence.