JC Cost Totals Drilldown

You can use the JC Cost Totals Drilldown report by selecting Job Cost > Reports > JC Cost Totals Drilldown.

The JC Cost Totals Drilldown has basically 3 levels to drill down to.

Prior to drill down each Job is listed. This level includes Job, original estimate, current estimate, actual cost, and variance.

On the second level phase, original estimate, current estimate, actual cost (or projected) and variance by phase are included.

On the third level are Cost type, unit of measure, current estimated hours, units and cost, and actual (or projected) hours, units and cost.

Input parameters include an option to include actual or projected information, and beginning and ending job.

Report Parameters

Description

Company

Accept the default, or press F4 to select a company.

Beginning Job

Select the Field Lookup button or press F4 to select the beginning job.

Ending Job

Select the Field Lookup button or press F4 to select the ending job.

(A)ctual or (P)rojected Costs

Enter A or P

Beginning Month for CT Detail

Enter beginning month (MM/YY) for cost type detail.

Through Month

Enter through month (MM/YY).

(O)pen or (A)ll Jobs

Enter O or A.