PC Bid Swing

You can use the PC Bid Swing report to show how the estimating department is performing when compared to their primary competitors in shared markets. To access this report, select Pre-Construction > Reports > PC Bid Swing.

Each project is broken down by bid package and can be grouped any two of the following options: Prime/Sub, Project Type, Estimator, or Department. Additional sorting can be performed using either Bid Date or Bid Status.

Parameters

Company

Accept the default, or press F4 to select a company.

Enter Department

Click the Field Lookup button or press F4 to select the department or leave blank for all.

Beginning Bid Date

Enter beginning bid or leave blank for all.

Ending Bid Date

Enter ending bid or leave blank for all.

Project Type

Click the Field Lookup button or press F4 to select the project type or leave blank for all.

Bid Status

Click the Field Lookup button or press F4 to select the bid status or leave blank for all.

(P)rime/(S)ub (Blank for Both)

Enter P, S or leave blank for all.

Competitor Name

Enter competitor name.

Bid Awarded Status (Y)es, (N)o or blank for all

Enter Y, N or leave blank for all.

Group 1

Click the Field Lookup button or press F4 to select the static bid analysis group for group 1 or leave blank for all.

Group 2

Click the Field Lookup button or press F4 to select the static bid analysis group for group 2 or leave blank for all.

Optional Sort Order by (B)id Date or (S)tatus

Enter B, S, or leave blank.