Approve a Field Ticket
After a user has submitted a Field Ticket, those assigned to the job in the JC Jobs or PM Projects will be able to approve the time from the Field Ticket Dashboard.
- Job Time and Equipment usage are saved to the Field Ticket and the PR Timecard Entry batch.
- Progress Entry and Material Usage entered in the Field Ticket are processed in a batch.
- The Field Ticket PDF is attached to the JC Field Ticket table in Vista. For more information on the integration, see Field Tickets Integration with Vista.